HWY NEW BSTN RD over I 90

AT I-90 MM 77.2 · County 027, Massachusetts · Built 1957 · 2 Lanes · 3,265 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S300284MWDOTNBI
Year Built
1957
Reconstructed
1996
Length
48.5 m (159.1 ft)
Max Span
23.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
3,265
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,658,000
Total Project Cost
$6,988,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.