HWY CEDAR ST over I 90

027 (4MX) · County 027, Massachusetts · Built 1957 · 2 Lanes · 526 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S300274MXDOTNBI
Year Built
1957
Reconstructed
1995
Length
49.7 m (163.1 ft)
Max Span
24.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
526
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,818,000
Total Project Cost
$5,728,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.