I 90 WB over HWY CLARKE RD

I-90 MM 75.4 · County 027, Massachusetts · Built 1957 · 2 Lanes · 23,602 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
S300254N2DOTNBI
Year Built
1957
Reconstructed
1992
Length
9.4 m (30.8 ft)
Max Span
7.3 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
23,602
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$32,000
Total Project Cost
$49,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.