US 20 WB/CHRLTN RD over I 84 EB

MM 6.8 · County 027, Massachusetts · Built 1974 · 2 Lanes · 10,186 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S300451PVDOTNBI
Year Built
1974
Length
47.9 m (157.2 ft)
Max Span
46 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
10,186
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,301,000
Total Project Cost
$6,452,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.