I 90 EB over I 90 RMPS EX 78 INT 9

END OF I 84 I4 · County 027, Massachusetts · Built 1957 · 2 Lanes · 27,839 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
S300294MTDOTNBI
Year Built
1957
Reconstructed
1982
Length
53.9 m (176.8 ft)
Max Span
25.3 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
27,839
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$954,000
Total Project Cost
$1,432,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.