I 90 WB over US 7 EAST ST

MM 7.5/A9/1M N. STCKBRDG · County 003, Massachusetts · Built 1957 · 2 Lanes · 17,712 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S260154H2DOTNBI
Year Built
1957
Reconstructed
1993
Length
47.3 m (155.2 ft)
Max Span
19.8 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
17,712
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,270,000
Total Project Cost
$6,406,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.