HWY MEADOW ST over WATER HOUSATONIC RIVER

AT RTE 102 INTERSECTION · County 003, Massachusetts · Built 1954 · 2 Lanes · 5,200 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
L05003058MUNNBI
Year Built
1954
Length
38.2 m (125.3 ft)
Max Span
37.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
5,200
Material
Steel
Design
Truss - Thru
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$6,067,000
Total Project Cost
$9,101,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.