I 90 EB over HWY FAIRVIEW ST

AT MM 9.4 A12 · County 003, Massachusetts · Built 1957 · 2 Lanes · 12,308 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L050474GMDOTNBI
Year Built
1957
Reconstructed
1993
Length
32.6 m (107 ft)
Max Span
10.1 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
12,308
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$588,000
Total Project Cost
$883,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.