HWY WILLOW ST over WATER HOUSATONIC RIVER

AT ROUTE 102 INT. · County 003, Massachusetts · Built 1951 · 2 Lanes · 300 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
3
Serious
Substructure
6
Satisfactory

Bridge Details

Structure #
L05002057MUNNBI
Year Built
1951
Length
38.1 m (125 ft)
Max Span
37.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
300
Material
Steel
Design
Truss - Thru
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$5,069,000
Total Project Cost
$7,604,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.