I 190 SB over HWY GREENLAND RD

@ MM 10.6 · County 027, Massachusetts · Built 1979 · 2 Lanes · 17,787 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S250261WGDOTNBI
Year Built
1979
Length
32.3 m (106 ft)
Max Span
30.5 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
17,787
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,936,000
Total Project Cost
$4,405,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.