I 190 NB over HWY JOHN DEE RD
1000 FT N OF DANA HILL RD · County 027, Massachusetts · Built 1979 · 2 Lanes · 15,077 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.412519, -71.794511
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 47 years old.
Nearby Bridges
I 190 SB over HWY JOHN DEE RD
Built 1979
HWY MUDDY POND over WATER STILLWATER RIVER
Built 2007
I 190 NB over HWY DANA HILL RD
Built 1979
I 190 SB over HWY DANA HILL RD
Built 1979
I 190 NB over WATER STILLWATER RIVER
Built 1979
I 190 SB over WATER STILLWATER RIVER
Built 1979
I 190 over HWY AGRICLTRL UNDRPS
Built 1979
I 190 NB over HWY GREENLAND RD
Built 1979
I 190 SB over HWY GREENLAND RD
Built 1979
I 190 SB over ST140 REDEMPTION ROCK TR
Built 1979
Bridge Details
- Structure #
- S250241WADOTNBI
- Year Built
- 1979
- Length
- 28.7 m (94.2 ft)
- Max Span
- 26.8 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 15,077
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $516,000
- Total Project Cost
- $775,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.