HWY MUDDY POND over WATER STILLWATER RIVER
.2 MI. E. OF I-190 · County 027, Massachusetts · Built 2007 · 2 Lanes · 2,571 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
42.410792, -71.79115
This bridge is in worse condition than 11.5% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 19 years old.
Nearby Bridges
I 190 NB over HWY JOHN DEE RD
Built 1979
I 190 NB over HWY DANA HILL RD
Built 1979
I 190 SB over HWY DANA HILL RD
Built 1979
I 190 SB over HWY JOHN DEE RD
Built 1979
I 190 NB over WATER STILLWATER RIVER
Built 1979
I 190 SB over WATER STILLWATER RIVER
Built 1979
I 190 over HWY AGRICLTRL UNDRPS
Built 1979
I 190 SB over ST140 REDEMPTION ROCK TR
Built 1979
I 190 NB over ST140 REDEMPTION ROCK TR
Built 1979
I 190 NB over HWY GREENLAND RD
Built 1979
Bridge Details
- Structure #
- S250086HYMUNNBI
- Year Built
- 2007
- Length
- 20 m (65.6 ft)
- Max Span
- 18.4 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,571
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,440,000
- Total Project Cost
- $2,161,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.