I 190 NB over HWY DANA HILL RD

MM9.7 0.4 N OF 140 · County 027, Massachusetts · Built 1979 · 2 Lanes · 16,694 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S250231W8DOTNBI
Year Built
1979
Length
28.3 m (92.8 ft)
Max Span
26.5 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
16,694
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$258,000
Total Project Cost
$388,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.