ST 12 WORCESTER RD over RR BMRR
AT CAMPGROUND RD · County 027, Massachusetts · Built 1947 · 4 Lanes · 4,227 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.404064, -71.769656
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 79 years old.
Nearby Bridges
HWY MUDDY POND over WATER STILLWATER RIVER
Built 2007
I 190 NB over HWY DANA HILL RD
Built 1979
I 190 SB over HWY DANA HILL RD
Built 1979
I 190 NB over HWY JOHN DEE RD
Built 1979
I 190 NB over ST140 REDEMPTION ROCK TR
Built 1979
I 190 SB over ST140 REDEMPTION ROCK TR
Built 1979
HWY SQUARESHIRE over RR BMRR
Built 1990
I 190 SB over HWY JOHN DEE RD
Built 1979
I 190 NB over HWY GREENLAND RD
Built 1979
I 190 NB over WATER STILLWATER RIVER
Built 1979
Bridge Details
- Structure #
- S2500922LDOT634
- Year Built
- 1947
- Reconstructed
- 1983
- Length
- 14.6 m (47.9 ft)
- Max Span
- 13.1 m
- Width
- 20.3 m (66.6 ft)
- Lanes
- 4
- Daily Traffic
- 4,227
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,680,000
- Total Project Cost
- $4,021,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.