ST 30 MAIN ST over WATER WACH AQUEDUCT

.2 MI. E. OF I-495 · County 027, Massachusetts · Built 1962 · 2 Lanes · 5,562 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S200201YTDOTNBI
Year Built
1962
Length
7.6 m (24.9 ft)
Max Span
6.1 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
5,562
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$728,000
Total Project Cost
$1,093,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.