I 495 SB over ST 30 MAIN ST

1.25 MILES NO. OF STATE 9 · County 027, Massachusetts · Built 1962 · 3 Lanes · 30,782 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S200171U8DOTNBI
Year Built
1962
Length
34.7 m (113.8 ft)
Max Span
15.5 m
Width
16.2 m (53.1 ft)
Lanes
3
Daily Traffic
30,782
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,693,000
Total Project Cost
$5,540,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.