I 495 NB over ST 30 MAIN ST

1.25 MILES NO OF ST. 9 · County 027, Massachusetts · Built 1962 · 3 Lanes · 32,128 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S200171U7DOTNBI
Year Built
1962
Length
35.3 m (115.8 ft)
Max Span
16.3 m
Width
16.2 m (53.1 ft)
Lanes
3
Daily Traffic
32,128
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,787,000
Total Project Cost
$5,681,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.