I 495 SB over COMB MDC AQUEDUCT & CSX

MM 61.2 /1.5 MI N OF ST-9 · County 027, Massachusetts · Built 1962 · 3 Lanes · 41,411 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
S200181UADOTNBI
Year Built
1962
Reconstructed
1990
Length
100.9 m (331 ft)
Max Span
25.3 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
41,411
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,688,000
Total Project Cost
$16,033,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.