HWY MILLER AVE over WATER SCHENOB BROOK

300 WEST OF ROUTE 7 · County 003, Massachusetts · Built 1996 · 2 Lanes · 1,164 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S10006086MUNNBI
Year Built
1996
Length
25.6 m (84 ft)
Max Span
23.5 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
1,164
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,715,000
Total Project Cost
$4,073,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.