US 7 N MAIN ST over WATER HUBBARD BROOK

.1 MI NORTH OF MAPLE AVE · County 003, Massachusetts · Built 1924 · 2 Lanes · 7,842 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S1000509RDOTNBI
Year Built
1924
Length
15.3 m (50.2 ft)
Max Span
13.3 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
7,842
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,078,000
Total Project Cost
$1,618,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.