HWY COUNTY RD over WATER IRONWORK BROOK

0.6 MI S OF CROSS RD · County 003, Massachusetts · Built 1949 · 2 Lanes · 1,293 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S1002902FMUNNBI
Year Built
1949
Length
9.1 m (29.9 ft)
Max Span
8.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
1,293
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$591,000
Total Project Cost
$887,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.