HWY KELLOGG RD over WATER HOUSATONIC RIVER

0.2M EAST OF RT 7 · County 003, Massachusetts · Built 1963 · 2 Lanes · 857 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
S10013087MUNNBI
Year Built
1963
Length
32.7 m (107.3 ft)
Max Span
31.2 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
857
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,164,000
Total Project Cost
$3,247,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.