HWY FLINT ST over WATER NORTH RIVER CANAL

.4 MI SW. OF RT114 · County 009, Massachusetts · Built 1998 · 3 Lanes · 12,801 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S01021AV1MUNNBI
Year Built
1998
Length
13.8 m (45.3 ft)
Max Span
13.8 m
Width
36.8 m (120.7 ft)
Lanes
3
Daily Traffic
12,801
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,345,000
Total Project Cost
$5,018,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.