ST107 BRIDGE ST over RR MBTA (STORAGE TUN)

.32 KM N SALEM CENTER · County 009, Massachusetts · Built 1949 · 2 Lanes · 24,000 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S0101732RDOT634
Year Built
1949
Length
57.9 m (190 ft)
Max Span
19.8 m
Width
93 m (305.1 ft)
Lanes
2
Daily Traffic
24,000
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,004,000
Total Project Cost
$10,507,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.