HWY MARCH ST over COMB US 1A BYPASS & MBT

.1MI W ST 1A · County 009, Massachusetts · Built 1994 · 2 Lanes · 259 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S0100932QDOT634
Year Built
1994
Length
28.7 m (94.2 ft)
Max Span
26.8 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
259
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,401,000
Total Project Cost
$2,102,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.