ST114 NORTH ST over COMB ST107/BRG ST&MBTA

.1 MI W SALEM CENTER · County 009, Massachusetts · Built 1952 · 4 Lanes · 34,513 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
S0101832TDOT634
Year Built
1952
Length
42.1 m (138.1 ft)
Max Span
20.1 m
Width
22.1 m (72.5 ft)
Lanes
4
Daily Traffic
34,513
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,170,000
Total Project Cost
$9,256,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.