I 90 EB over HWY DICKINSON HILL RD

0.1 MI. N. OF RTE 23 C4 · County 013, Massachusetts · Built 1957 · 2 Lanes · 30,141 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
R130194GYDOTNBI
Year Built
1957
Reconstructed
1990
Length
12.9 m (42.3 ft)
Max Span
10.9 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
30,141
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$41,000
Total Project Cost
$62,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.