ST 23 BLANDFORD RD over I 90

1.1MI W OF RT20/23 JCT C5 · County 013, Massachusetts · Built 1957 · 2 Lanes · 2,720 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
R130204GWDOTNBI
Year Built
1957
Reconstructed
1993
Length
74.5 m (244.4 ft)
Max Span
20.8 m
Width
15.7 m (51.5 ft)
Lanes
2
Daily Traffic
2,720
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,645,000
Total Project Cost
$11,468,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.