I 90 over WATER POTASH BROOK

AT MILE 34.0 · County 013, Massachusetts · Built 1957 · 4 Lanes · 28,837 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
R130214GXDOTNBI
Year Built
1957
Length
7.8 m (25.6 ft)
Max Span
3.3 m
Lanes
4
Daily Traffic
28,837
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$592,000
Total Project Cost
$889,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.