HWY RUSSEL STAGE over WATER FREELAND BROOK

AT INT. W/ NYE BROOK ROAD · County 013, Massachusetts · Built 1988 · 2 Lanes · 388 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
B14024AQYMUNNBI
Year Built
1988
Length
9.7 m (31.8 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
388
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$553,000
Total Project Cost
$830,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.