US 20 HUNTNGTON RD over WATER BRADLEY BROOK

300 SOUTH OF MAIN ST · County 013, Massachusetts · Built 1924 · 2 Lanes · 7,286 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
R130140B5DOTNBI
Year Built
1924
Length
14.1 m (46.3 ft)
Max Span
12.3 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
7,286
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,159,000
Total Project Cost
$1,739,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.