HWY MAIN ST over COMB CSX/WESTFIELD RIV

0.5 MI E OF US 20 115.38 · County 013, Massachusetts · Built 1972 · 2 Lanes · 749 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
R130010E6DOT634
Year Built
1972
Length
140.2 m (460 ft)
Max Span
34.1 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
749
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,273,000
Total Project Cost
$7,910,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.