I 90 EB over HWY RUSSELL STAGE RD

0.35 MI. N. OF RTE 23 C3 · County 013, Massachusetts · Built 1957 · 2 Lanes · 30,141 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B140234G3DOTNBI
Year Built
1957
Reconstructed
1990
Length
21.5 m (70.5 ft)
Max Span
18.6 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
30,141
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$395,000
Total Project Cost
$593,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.