HWY BEECH HLL RD over WATER POND BROOK

0.6MI S OF RT23 NEAR RES · County 013, Massachusetts · Built 1930 · 2 Lanes · 120 vehicles/day

Overall
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B1401703FMUNNBI
Year Built
1930
Length
11 m (36.1 ft)
Max Span
11 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
120
Material
Concrete
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$476,000
Total Project Cost
$715,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.