HWY WETHERSFIELD over WATER BACHELDER BROOK

0.2 MILES FROM RT1. · County 009, Massachusetts · Built 2009 · 2 Lanes · 1,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
R11009B80MUNNBI
Year Built
2009
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
1,200
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$655,000
Total Project Cost
$983,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.