HWY TENNEY ST over I 95

1.1 KM N OF ST-133 · County 009, Massachusetts · Built 1976 · 2 Lanes · 2,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
G0300431WDOTNBI
Year Built
1976
Length
83.5 m (274 ft)
Max Span
41.3 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
2,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,208,000
Total Project Cost
$15,313,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.