ST133 E MAIN ST over I 95

2.9 KM E GEORGETON CENTER · County 009, Massachusetts · Built 1976 · 4 Lanes · 15,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
G030032YTDOTNBI
Year Built
1976
Length
79.5 m (260.8 ft)
Max Span
38.5 m
Width
29.6 m (97.1 ft)
Lanes
4
Daily Traffic
15,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,374,000
Total Project Cost
$23,062,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.