HWY JEWETT ST over I 95

3.2 KM N ST133 · County 009, Massachusetts · Built 1975 · 2 Lanes · 3,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
G0300531RDOTNBI
Year Built
1975
Length
85 m (278.9 ft)
Max Span
42 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
3,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,322,000
Total Project Cost
$19,984,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.