HWY CENTRAL ST over I 95

QUARTER MILE N PARKER RIV · County 009, Massachusetts · Built 1976 · 2 Lanes · 1,930 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
N100212Y2DOTNBI
Year Built
1976
Length
75.6 m (248 ft)
Max Span
36.9 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
1,930
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,141,000
Total Project Cost
$12,212,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.