US 1 NEWBRPRT TPK over WATER PARKER RIVER

2.6 MI S MBTA · County 009, Massachusetts · Built 1971 · 2 Lanes · 7,950 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
N100092TADOTNBI
Year Built
1971
Length
53.4 m (175.2 ft)
Max Span
25.9 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
7,950
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,329,000
Total Project Cost
$7,994,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.