US 1 NEWBRPRT TPK over WATER LITTLE RIVER

.2 MI S OF MBTA · County 009, Massachusetts · Built 1922 · 4 Lanes · 44,612 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
N100042TBDOTNBI
Year Built
1922
Reconstructed
1935
Length
7.6 m (24.9 ft)
Max Span
6.4 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
44,612
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,272,000
Total Project Cost
$4,909,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.