ST113 HIGH ST over OTHER CLIPR RAIL TRAIL

.1 MI W OF US-1 · County 009, Massachusetts · Built 1907 · 2 Lanes · 14,930 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
N1100232KDOT634
Year Built
1907
Length
13.1 m (43 ft)
Max Span
12.2 m
Width
20.7 m (67.9 ft)
Lanes
2
Daily Traffic
14,930
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,882,000
Total Project Cost
$2,824,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.