I 495 NB over RR MBTA (ABANDONED)

.4 MI E OF TAUNTON TL · County 005, Massachusetts · Built 1978 · 4 Lanes · 65,431 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
R020273T3DOTNBI
Year Built
1978
Length
13.1 m (43 ft)
Max Span
11.3 m
Width
28.3 m (92.8 ft)
Lanes
4
Daily Traffic
65,431
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,573,000
Total Project Cost
$3,860,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.