HWY FIELD ST over WATER SNAKE RIVER

1 MI W OF RAYNHAM · County 005, Massachusetts · Built 1943 · 2 Lanes · 5,214 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
T010233KAMUNNBI
Year Built
1943
Length
18.9 m (62 ft)
Max Span
6.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
5,214
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,209,000
Total Project Cost
$1,814,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.