I 495 SB over WATER SNAKE RIVER

1.7 MI E OF NORTON TL · County 005, Massachusetts · Built 1980 · 3 Lanes · 38,969 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
T010593RVDOTNBI
Year Built
1980
Length
48.8 m (160.1 ft)
Max Span
47.2 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
38,969
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,604,000
Total Project Cost
$2,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.