ST104 N MAIN ST over I 495

ST 104 AT I 495 · County 005, Massachusetts · Built 1978 · 2 Lanes · 7,059 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
R020263VFDOTNBI
Year Built
1978
Length
74.1 m (243.1 ft)
Max Span
36.3 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
7,059
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,169,000
Total Project Cost
$1,754,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.