ST 3 A/S ARTERY over WATER TOWN RIV BAY CANAL

.8 KM NW OF JCT SR 53 · County 021, Massachusetts · Built 1994 · 4 Lanes · 42,802 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
Q010163F5DOTNBI
Year Built
1994
Length
16.3 m (53.5 ft)
Max Span
4.9 m
Width
89.9 m (294.9 ft)
Lanes
4
Daily Traffic
42,802
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$729,000
Total Project Cost
$1,094,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.