ST 3 A over WATER FORE RIVER

AT WEYMOUTH TWN LINE · County 021, Massachusetts · Built 2018 · 4 Lanes · 46,164 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
Q010015WJDOTNBI
Year Built
2018
Length
428.8 m (1406.8 ft)
Max Span
98.8 m
Width
22.5 m (73.8 ft)
Lanes
4
Daily Traffic
46,164
Material
Steel
Design
Movable - Lift
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.