HWY GRANITE ST over TR RED LINE SSH
130 FT SW OF HANCOCK ST · County 021, Massachusetts · Built 1971 · 4 Lanes · 8,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.248814, -71.003714
This bridge is in worse condition than 29.2% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 55 years old.
Nearby Bridges
HWY QNCY CTR CON over COMB MBTA&REDS&PARKING
Built 2002
HWY DIMMOCK ST over TR RED LINE SSH
Built 1971
HWY SCHOOL ST over TR RED LINE SSH
Built 1972
HWY WATER ST over COMB BRGN PKY&MBTA&REDS
Built 1936
HWY ADAMS ST over TR RED LINE SSH
Built 1967
ST 3 A/S ARTERY over WATER TOWN RIV BAY CANAL
Built 1994
ST 3 RAMP XX over HWY CENTRE ST
Built 2009
ST 3 RAMP X&Y @T over HWY CENTRE ST
Built 1981
ST 3 RAMP Y @ T over OTHER RELIEF
Built 1981
ST 3 RAMP X @ T over HWY RAMPS C & CC
Built 1981
Bridge Details
- Structure #
- Q010074UGMBTNBI
- Year Built
- 1971
- Length
- 24.7 m (81 ft)
- Max Span
- 21 m
- Width
- 29.9 m (98.1 ft)
- Lanes
- 4
- Daily Traffic
- 8,200
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other State Agencies
- Last Inspected
- N/A
- Est. Improvement
- $971,000
- Total Project Cost
- $1,457,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.