HWY ADAMS ST over WATER MONATIQUOT RIVER

ADJACENT TO ARNOLD STREET · County 021, Massachusetts · Built 1971 · 2 Lanes · 2,715 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B21006339MUNNBI
Year Built
1971
Length
14 m (45.9 ft)
Max Span
12.8 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
2,715
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,481,000
Total Project Cost
$2,222,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.